The question at a recent go/no-go that started this

Ahead of a recent go-live decision, a board member asked something simple. "If this goes wrong, what's the one thing we wish we'd checked?" The room went quiet. What followed was a status pack: green across every row, a signed test strategy, a stage gate passed with sign-off from every workstream lead.

The board looked at it for a moment. Nobody could actually answer the question.

That exchange is a fair summary of where most testing conversations land, right up to the moment something goes wrong. The intention is there. The sign-offs are real. What's harder to demonstrate is whether the testing that sits behind them would actually have caught the fault that takes the platform down.

Pete Richardson

“The best partners tell you the difficult thing, then help you fix it. Test your thinking with us before it’s tested for you.”

Pete RichardsonDirector, Green Dolphin

Why the current approach is not enough

RAG statuses and stage-gate sign-offs are a reasonable starting point. The problem is what happens next. A status report says "testing complete." It doesn't say what was tested, at what volume, against what tolerance, or what was descoped along the way to hit the date.

Most testing status reports look broadly the same from one release to the next, regardless of how much the underlying risk has actually changed. They measure whether an activity happened, not whether the release is safe.

Stage-gate frameworks used across the sector are a genuine strength. They give structure, named ownership, and a documented trail. But a stage gate tells you a document was produced and a box was ticked. It doesn't tell you whether the testing behind that box would catch the specific fault most likely to cause harm. That's a different question, and it needs a different kind of evidence: not "was it tested," but "would this testing have found the problem that actually occurred."

Why testing scope stays exposed

Testing rarely gets cut in one visible decision. It erodes.

A timeline slips. A non-functional test (the kind that checks how a platform behaves under real load, not just whether the happy path works) gets descoped to protect the date. The decision is treated as a technical call, made below the level where anyone assesses what risk is being accepted. Sign-off responsibilities shift partway through a programme, and the people accountable are never told the change happened.

That is not a hypothetical. It is the FCA and PRA's own finding, in the Final Notice that fined a UK bank £48.65 million in December 2022 over a platform migration that left customers unable to access their accounts for months. A specific non-functional test was descoped outside the proper governance forum. Had it gone ahead, the regulator states it is likely the fault that caused the outage would have been found. Separately, responsibility for signing off testing changed hands during the programme, and that change was never put in front of the board before it approved going live.

What the data shows

The pattern isn't confined to one bank. Uptime Institute's 2025 Annual Outage Analysis found that IT and networking issues rose to 23% of impactful outages in 2024, a rise it attributes largely to increasing system complexity driving change-management and configuration problems. Separately, of the organisations reporting a major outage caused by human error over the past three years, 85% traced back to staff not following procedure, or to flaws in the procedure itself, not a one-off mistake, a process gap.

Closer to home, the Treasury Select Committee's correspondence on IT failures found UK banks and building societies accumulated 803 hours of unplanned IT outages over a two-year period, with third-party failures among the leading causes. The financial sector has improved its outage frequency over the last three years compared with the long-term average: the investment in resilience is working. What hasn't reduced at the same rate is the share of incidents that trace back to change itself, rather than steady-state operation.

What proportionate testing evidence actually means at your scale

This isn't about testing everything exhaustively. Nobody has the budget or the time for that, and it isn't what the evidence above calls for either.

One honest observation from our own work with building societies is worth stating plainly. A first pass at reviewing testing evidence rarely produces a clean answer. What it produces is a smaller, sharper list: two or three points where the evidence for "this will work" is actually an assumption, not a test result. That's not a weakness in the exercise. It's the point of it. The goal isn't a perfect testing programme. It's an honest, traceable answer to "what do we actually know, and what are we assuming," that can be challenged and closed down before go-live rather than after.

A simple frame helps here. For every piece of logic or integration that matters to the release, ask whether it's:

Proven: tested against a result you know is right, with evidence;

Assumed: believed to be fine because nothing has flagged otherwise; or

Untested: not yet looked at, knowingly or otherwise.

Most releases have more in the second category than anyone would say out loud in a steering meeting.

One further point that's easy to overlook: evidence that nobody independently challenges doesn't solve the problem either. A testing pack reviewed only by the team that built the change is a different version of the same issue this post opened with: a green status nobody outside the room actually tested.

Our Interactive Risk Radar gives the starting baseline this work builds from: a structured view of testing, delivery and governance exposure across a change, in under thirty minutes, so you know where the real gaps sit before deciding where to focus review time.

Questions worth testing

Based on what we're seeing right now in banks and building societies, these are the questions that separate genuine confidence in a release from a status report that looks confident:

If the logic used changes after go-live (a rule, a rate, a model weight, a data-matching threshold) is our business-as-usual testing capability already proven effective enough to handle that?

If we have to roll back weeks after go-live, how would we unwind every decision the new system has already made on live data?

Who outside the team that built this has been given the authority, and the opportunity, to say a specific piece of logic is wrong?

Have we tested the process for identifying and addressing a customer incident, and do we understand what remediation and cost would actually look like?

Of everything this release depends on, how much is proven, how much is assumed, and has anyone said that difference out loud to the people making the go/no-go decision?

A practical starting point for a smaller society

Most of the building society leaders we work with aren't short on commitment to getting this right. They're short on a starting point that doesn't require a programme, a platform, or a team they don't have.

Start with what the stage gate already gives you. It's a genuine foundation, not something to discard. Layer on a testing-evidence review for the release that matters most this quarter: not everything, just the two or three points where "proven" is actually "assumed." Ask the five questions above of the team bringing a change to go/no-go. Use the Risk Radar to see the wider picture before committing review time to any one area. Then make it a standing habit for every material release, not a one-off exercise.

That's enough to materially change what a board actually knows before it says yes, and it's proportionate to the size and resource of a smaller society.

If your board were asked tomorrow what would have actually changed the outcome of your last release, could they answer with evidence, or with a status report? That's the question we hear most from building society leaders. It's the one we help them answer.

We're here to guide you through change with clarity and care. Our mission is to give every building society and bank the senior expertise they need to navigate change, manage risk, and serve their members well, without the cost, complexity or compromise that comes with working with a large firm.

Sources

FCA and PRA Final Notice, TSB Bank plc, 20 December 2022

Treasury Select Committee, "IT failures in the financial services sector," HC 224, 28 October 2019, and subsequent correspondence on IT failures

FCA Policy Statement PS21/3 and PRA Policy Statement PS6/21, Building Operational Resilience, March 2021 (rules in force 31 March 2022, transition period ended 31 March 2025)

PRA Supervisory Statement SS1/23, Model Risk Management Principles for Banks, May 2023 (in force 17 May 2024)

Uptime Institute, Annual Outage Analysis 2025

Building Societies Association, Building Societies Report 2025 (with Whitecap Consulting). Full sourcing for everything in this series is on our Risk Radar

Article